top of page
Lifecycle & Asset Management
BCP’s approach to Plant Lifecycle Management (PLM) focuses on proactively managing the plant operations over the entire life of the plant. PLM is focused on minimizing risk and total costs from concept through decommissioning of the plant/systems.
-
Virtual Plant Modeling
-
Configuration Management
-
Plant Modifications and Replacements
-
Equipment Reliability
ASSET MANAGEMENT CASE STUDY – RCP MOTOR REPLACEMENT
BCP planning the reactor coolant pump motor replacement using 3D technologies, modeling and simulations. Using an existing laser scan of the containment, BCP created in conjunction with its technology partner a model of containment, the RCP motor and moving elements including crane model with specifications. BCP developed the simulation sequence and task elements with associated schedule.
In running the simulation conflicts were identified and issue including the polar crane reach issues, allowing for work arounds to be developed in advance of the outage saving several days of outage time.
bottom of page