#3945
Job Categories:
Location
Plant Robins - Warner Robins AFB
Estimated Start Date
May 22, 2023
Estimated Duration of Work
Initially six months with extensions expected

Mechanical Lead 1 or 2 – Plant Robins – Warner Robins AFB
Resumes will be received through 3pm CST on Friday, May 05
Estimated Start Date:  5/22/223
Estimated Duration of Work Assignment: 6-8 Months (at least initially)
Pay Rate: Not Defined / need Candidate’s requested rate
Per Diem: $94.00 / day ($660.00 per week)
Mob / Demob: $500.00 each ($1,000 total)

Desired Qualifications:

  • Heavy Construction and
  • Foundation, Tank and Piping Install Experience

Note: This position is located at the GPC generating facility on the Warner Robins Air Force Base. The candidate will have to be successfully screened (back ground check) through the Air Force to be granted access to the site.


Apply Online

  • Max. file size: 50 MB.
  • Hidden
  • Hidden
  • Hidden
  • Hidden
  • This field is for validation purposes and should be left unchanged.

Primary Contact

Name
Laura Evertsen
Phone